Horiba establishes state-of-the-art US$12m battery test facility

Horiba is building a new US$12m test facility for batteries and fuel cells at the Horiba Biwako E-Harbor site in Otsu City, Shiga Prefecture, which will enable it to better respond to future test requirements.
The facility includes laboratories dedicated to battery cell analysis, modules, and packs equipped with the latest test equipment including test systems for charge-discharge cycle evaluation and thermal management climatic durability analysis.
By establishing the laboratories within the existing E-Lab at Horiba Biwako E-Harbor, engineers will be able to work with others from the powertrain department where conventional engines and drivelines are developed, on the evaluation of batteries and battery management systems.

编辑推荐
最新资讯
-
商用车及工程机械行业专场:NVH 及语音音频
2025-08-01 17:12
-
理想i8和重卡对撞测试引争议,东风柳汽发声
2025-08-01 15:52
-
艾德克斯IT-N2100 系列太阳能阵列模拟器
2025-08-01 15:43
-
ITECH重磅发布IT2705直流电源分析仪,重构
2025-08-01 15:34
-
现代汽车新一代混合动力系统:以技术革新引
2025-08-01 15:32